Why Kenya
Why your AI should be answered at home.
Most AI used in Africa runs in data centres on other continents. Here is where a prompt goes today, and what changes when the machines are in Nairobi.
1Where a prompt goes today
Today, the answer comes from abroad.
Africa holds less than one percent of the world's data centre capacity, so nearly every request leaves the continent.
Every request is a copy of something that matters: an account, a tender, a patrol report. It crosses an ocean, is run on a model under another country's law, and comes back.
what leaves, every day
- a bank
Check these 4,000 transfers from account 0112 4471 9920 for laundering.
- a ministry
Compare the three bids for the Northern Corridor tender.
- a force
Summarise last night's reports from Garissa sector.
Someone else's law
A prompt run abroad answers to that country's courts and agencies before it answers to yours.
Someone else's switch
Access can be repriced, rationed, sanctioned or cut off by a decision you had no part in.
Someone else's cable
Twice in 2024, damaged sea cables took much of Africa's internet down for days. AI across an ocean goes down with it.
Someone else's economy
The spend leaves in dollars. The skills and the machines are built up somewhere else.
2With the models in Nairobi
The same prompts, answered at home.
A hundred requests. Each square is one prompt sent from Nairobi. The machines that can answer it are almost all abroad, so that is where it goes. The red one is what stays.
Draw the line. Put the models on this side of it and the same hundred are answered in Nairobi. Nothing crosses unless you send it.
the correction
Customer records, processed in Dublin.
Case files, read in Virginia.
Network logs, analysed in Frankfurt.
3The numbers
Asked in Kenya. Answered somewhere else.
Few countries turn to AI as readily as Kenya, and almost none of the machines that answer are on the continent. Both numbers are moving.
- 42.1%
of Kenya's internet users used ChatGPT in a single month. That is the highest share of any country.
DataReportal and Meltwater, July 2025
- 0.6%
of the world's data centre capacity is in Africa, home to nearly 18 percent of its people. The United States, China and Europe draw 85 percent of the power.
World Bank, October 2026. International Energy Agency, 2025
- 3.5 to 5.5×
the growth expected in data centre demand by 2030 in Africa's five largest markets, Kenya among them: from about 0.4 gigawatts to between 1.5 and 2.2.
McKinsey, November 2025
4Why Nairobi
The cables land here. The power is clean.
Sea cables land at Mombasa, Kenya's grid runs about four-fifths on geothermal, hydro, wind and sun, and Nairobi has the engineers.
Sovereign AI for Africa.
AI model hosting and data processing, on our own servers in Nairobi.
